How to maintain the high and low temperature alternating heat and humidity test chamber in daily life and how to maintain it In daily life, many customers ask: How to maintain the high and low temperature alternating heat and humidity test chamber should be how to maintain, here is our Xiaotian Xiaobian to explain for you: 1. The radiator (condenser) of the refrigeration unit should be regularly maintained and kept clean. Because the dust paste condenser will cause the compressor high-voltage switch to trip and cause false alarm, the condenser should be regularly maintained every month, use the vacuum cleaner to suck the dust attached to the condenser heat-dissipating mesh or use the hard hair after booting. Brush or use a high pressure nozzle to blow off the dust. 2. When opening or closing the test object from the furnace, do not allow the article to contact the rubber edge on the door to prevent the rubber edge from being damaged and shortening the life. 3. The ground around the fuselage and the bottom of the fuselage should be kept clean at all times to avoid a large amount of dust inhaling the unit to produce accidents and reduce performance. 4. The freezing system is the core of the machine. Please check all copper pipes for leaks in a year. All the joints and welding joints. If there is any oil spill, please inform the company or directly deal with it. 5. Humidifier and water tray should be cleaned frequently to avoid scale and affect the evaporation of steam. Generally, it should be cleaned once after one test. The scale is removed in time to extend the life of the humidification tube. Please ensure the use of copper when the water flow is smooth. Brush the brush and rinse it off with water . 6. The large current contact of the switchboard, the power distribution room must be cleaned and overhauled more than once a year. If the contact is loose, the whole equipment will be in a dangerous working state. If it is light, the components will be burnt out, and fires and alarms will occur. Personal injury is a very dangerous thing. When cleaning, you can use a vacuum cleaner to remove indoor dust. 7. The wet cloth of dry and wet balls should be inspected frequently. When the surface of the test cloth is not clean or hardened, or after the temperature is controlled above 85 °C, continue to control before temperature and humidity. If it is checked, if it is not water-absorbent, please replace it. It is related to the accuracy of moisture measurement. The test cloth is usually replaced once in March. When replacing, wipe the temperature measuring body with a clean cleaning cloth. When replacing the new test cloth, wash the hand first and then clean the sink. clean. 8. Check and adjust the wet water level, The water level of the water trap should not be too high. If it is too high, the water will overflow the water trap or if it is too low, the wet bulb test cloth will not absorb water properly, which will affect the accuracy of the wet bulb. The water level is approximately six minutes full. Adjust the water level of the water tank, adjust the height of the water tank [adjust the screws on both sides] 9. Inspection and maintenance of waterways The water pipe of the waterway is a device that is easy to block and leak easily. Please check regularly for leaks and water shutoff. If it is, please dispose of it or notify the company in time. The water stored in the humidifier should be replaced once a month to ensure water quality. Clean and smooth water flow. 10. There are two over-temperature protectors in the distribution box. Please do not use it for debugging. Because it has been adjusted at the factory, this protection switch is used to protect the heating pipe and the humidification pipe from air-burning and water shortage alarm. Fixed point = temperature set point +20 ° C ~ 30 ° C 11. When the time of the test product is taken, the product must be shut down and the operator must wear dry, anti-electricity and temperature-resistant gloves to pick up and place the product. 12. The cleaning and maintenance test machine inside and outside the cabinet should be cleaned of impurities (objects) before operation. The power distribution room should be cleaned at least once a year. When cleaning, use a vacuum cleaner to remove indoor dust. The outside of the cabinet must be cleaned more than once a year, and it can be wiped with soapy water during cleaning.
In addition to the french press,coffee bean canister, we also have another hot selling coffeeware--milk pitcher. Our factory have several different kinds anddifferent size milk jug for you to choose. Such as the one with wooden handle, color painting milk jug and so on. Our factory focus on provide the excellent quality OEM products, which can produce or packing the cargo according to your requirements. I believe our products and good service can help you win he market. Welcome to ask for the catalog and the quotation. Waiting for your inquiry.
Material:SS304
Finishing: Satin polishing ,Mirror Polishing ,Color painting
Logo: Laser logo, Etching logo, Silk printing logo, Embossed logo, Decal logo
MOQ : 2000 PCS
Packaging : White box, Mail box or Customized package
Sample Time : 7~10 days
Lead Time :60 days after have the deposit
Payment: T/T ,L/C or others
Payment term: 30% deposit before production and 70 % balance against the copy B/L
FAQ:
1:How can I get the sample?
We can provide the sample for customers to check the quality.
Please kindly provide the delivery info for calculate the sample cost. If you have DHL /TNT/UPS/FEDEX account, please also kindly provide it to us.
You can do the payment of sample via T/T and PayPal.
2:How about the sample time?
Usually the sample time is 7~10 days after have the sample cost.
3:How long will it take for mass production?
Usually 45~60 days after have the deposit.
4:Can we have our logo or company name to be printed on your products or the package?
Welcome OEM.
5:what certificate can you provide?
CE,CB,GS,FDA,LFGB,ROHS are available here.
6:How can we get your monthly new products announcement?
Please join our mailing lists.
Welcome to provide the OEM requirement and ask for the quotation.
Will try the best to give you a good service.
Milk Pitcher,Milk Pitcher Ceramic,Glass Milk Pitcher,Farmhouse Milk Pitcher Jiangmen Wellway Houseware Co.,Ltd , https://www.hkwellway.com
November 15, 2024