Construction Unit: Beijing Tianqiao Shengshi Cultural Development Co., Ltd. Postal address: Building 1, No. 6 Yuetan West Street, Xicheng District, Beijing Postal code: 100045 Construction Unit: Beijing Tianqiao Shengshi Cultural Development Co., Ltd. Postal address: Building 1, No. 6 Yuetan West Street, Xicheng District, Beijing Postal code: 100045 Construction Unit: Beijing Tianqiao Shengshi Cultural Development Co., Ltd. Postal address: Building 1, No. 6 Yuetan West Street, Xicheng District, Beijing Postal code: 100045 Design Unit: Beijing Institute of Architectural Design - Zhonghui International Studio Postal address: No. 62 South Lishi Road, Xicheng District, Beijing Postcode: 100045 MIS Single Stage Water Pump,Direct Coupled Pump,End Suction Pump Hebei Yongquan Pump Industry Co., Ltd. , http://www.cnsolarpump.com
Progress Stage: Engineering Design Region: Beijing Construction Period: October 2011 - October 2012 Major Equipment: Cranes, Building Materials, Exterior Wall Decoration Materials, Door and Window Glass, Sanitary Ware, Elevators, Cranes, Waterproof and Anticorrosion Materials, Paint Coatings ,Valve Assembly,Ceramic Products,Water Supply and Drainage System,Fire Fighting System,Pipe Fittings,Water Supply Equipment,Outdoor Drainage,Construction Electrical,Lighting Fixtures,Low-Voltage Electrical Apparatus,Wires and Cables,Light Current System,Lightning Protection System,Bucks Distribution Cabinet,Steel Construction . (for reference only)
Project Description:
The project is located on the west side of Tianqiao South Street in Xuanwu District, Beijing. The interior decoration and renovation of a five-storey commercial building has a two-story basement with a total construction area of ​​46,397 square meters. The total investment of the project is 100 million yuan.
Contact: Wang Feng, 010-88087886
Contact: Sui Hongdian, 15901399140
Contact: Yang Chunpeng Tel, 88087886, 15901399140
Contact person: Wu Yudian, 88021715
Project Name: Beijing Century Bridge Commercial Building Renovation Project (October 2011 - October 2012, 100 million)
Related Developments: Tower Crane Infrastructure Project