“In the first half of this year, through the joint efforts of all parties, the reliability of the West-to-East GE/NP and electric-drive compressor group has been greatly improved.” Recently, the person in charge of the operation of the compressor group of the West-East Gas Pipeline Company told reporters .
According to briefings, at present, there are 18 compressor stations on the entire pipeline of the West-East Gas Pipeline. At the highest peak, there are 24 world-class 30 MW compressor units running at the same time. The daily delivery of natural gas is up to 45 million cubic meters.
In the first half of this year, GE/NP units had a total of 38,000 hours of operation, which was 2.1 times the same period of last year. The number of failures was only 42% of last year, and the number of failures per thousand hours was also reduced from 10.3 last year to 2.05. In the first half of the year, the electric drive unit had a total of 11,600 hours of operation, which was close to the full-year operating time last year, while the breakdown rate per thousand hours was reduced from 4.4 to 3.5 times.
It is reported that since last year, the gas transmission capacity of the West-East Gas Pipeline has increased significantly, and the compressor's operating time has also risen significantly. This has greatly increased the pressure for ensuring safe and stable gas supply to the pipeline, and the long-term full-load operation has greatly shaped the compressor group. Security risks.
In order to ensure the reliability of the “heart” of the pipeline, the reliability of the compressor group, the company established a compressor group troubleshooting team to analyze and summarize the failures of the compressor group in the past few years. The research team has completely reconstructed the external circulating water system, filter ventilation system, compressed air and drying system that have the greatest impact on the compressor, which greatly reduced the number of breakdowns.
In addition, each management office along the West-East Gas Pipeline strictly implements the equipment management responsibility system, complies with the operation and maintenance operating procedures of the compressor unit, and promptly inspects and maintains each system of the compressor unit to comprehensively improve the reliability and availability of the equipment.

Auto L Bar Sealer

Auto L Bar Sealer and Shrink Tunnel has constant temperature knife sealing system and multi-pin perforator wheel for air evacuation. Coated sealing blades, easy clean, no film stuck with perfect sealing line. Film rack-cradle of rolling style, film releasing rollers and shafts. Film rack adjustable for perfect alignment between film rack and triangle-plate head.
Automatic L Sealer with synchronous and precise film release by motor can be Automatic film release for online product feeding, adjustable as per various products. Omron digital temperature controller with PID function. Safety emergence button. Accommodate single or multiple packages. Horizontal and vertical sensors for package detection. Sealing jaw opens up to 100mm ( FL 5545TBA) and 130mm (FL-6560TBA).

Auto L Bar Sealer,L Bar Sealing Machine,Automatic L Bar Sealer,Semi Automatic L Bar Sealer

SUZHOU SHENGBAIWEI PACKAGING EQUIPMENT CO.,LTD , https://www.sbwpack.com