Product Description: Product Packing: Standard Export Package. Delivery Date: Our Services: Q1Â What's the delivery term for making business with us? A1Â Usually we send the shipments in FOB term. Q2Â What's the delivery time after placing the order? A2Â Usually it takes 3 weeks after receiving your receipt payment.However,it would depend on our production line schedule(the timing clients place order)and the complication of the item. Q3Â What's the payment? A3Â By T/T,50% is paid in advance, balance before delivery
We can supply big range of such aluminum
Casting Parts, including investment casting and Sand Casting and Die Casting
Sand Casting method (Sand Casting)
Using Sand as Mold material, according to
the different components of Sand can be subdivided into wet Sand casting method
of Green Sand Mold), surface Dry Sand casting method (Dry Sand Mold), and so
on, but not all are available in the casting.
Advantage is lower cost, because the sand
mold use reusable;
Metal mould Casting process (Die Casting)
Of the raw materials of high melting point
metal production mold.The subdivided into gravity casting, low pressure casting
method and high pressure casting method.
Under the control of the melting point of
mold, can be molten metal is also limited.
Lost wax Casting, Investment Casting
This method can be as the outer membrane
casting method and the solid casting method.
To copy wax casting items required first,
and then into the pool with ceramic and stay dry, make with wax replica is
covered a layer of ceramic outer membrane, repeat steps until enough to support
outer membrane casting process (about 1/4 inch to 1/8 inch), then the wax
melting mould, and out of mold. Then mold need to high temperature for many
times, enhance behind the hardness could be used in the casting.
This method has good accuracy, can be used
as a high melting point metal, such as titanium casting.
B.
Main particulars
MAIN
PARTICULARS
Material for product
aluminum alloy,
Standard
ASTM, ASME, DIN, JIS,
ISO, BS, API, EN
Certificate
ISO9001
Dimension
As
per drawing, as large as we can
Processing
Step1:investment casting or sand casting
Step2:turning, milling, drilling,
grinding, threading, CNC Machining, boring
Finishing
surface
Machined
surface with oil, blasting and painting, anodize, polishing, powder painting,
electrophoretic coating-
Marking
as
per clients` requirements
Inspection
material,
construction, dimension, heat treatment, hardness, NDT
Quality
ISO9001,
PPAP control production
Lead
time
20-30
days for sample, consult with customer for mass production
Delivery
Express
for sample, ocean shipping/air for mass production
Our
Capabilities
CNC
machining, CNC center machining, drilling, milling, turning, grinding,
tapping, boring
Engineering
& manufacturing services
R&D
process, tooling and gauging design, product design
Integrated
CAD/CAM system, test and measuring
Others
Recyclable,
in line with environmental requirements and standards, and reliable
C.
Construction
Construction
by casting and machining
D
Workmanship
The
workmanship have good production practice. Care are taken to ensure High
accuracy and smooth surfaces
E.
Certificates
-
Material certificates
-
Measuring reports
-
Inspection protocol
-
NDT reports
-
Fixed certificate: ISO9001 certificate
Our
service
Besides
above the general specifications, we can also supply some specific machining
parts as clients' requirements.
Package
and shipping
Export
cartons, pallets, wooden cases, Polybags
container
package and container transportation
Aluminum Casting Parts,Oem Aluminum Casting Parts,Aluminum Sand Casting,Aluminum Casting Auto Parts Shinvast Industry Ltd , https://www.shinvastindustry.com
Â
Â
Specification
Description
1) Duplex cylinder two post
2) Screw-up adjustment adapter
3) Electrical release from one side
4) 24v control box(OPTIONAL)
5) Aluminum motor prevents overheating
6) Rubber door-opening protection
7) Plastic powder coat finish
Lifting capacity
4000kg
Lifting height
1900mm
Min Height
110mm
Overall height
2822mm
Width between 2 posts
2770mm
Packing&Shipping:
Usually it takes 3 weeks after receving your receipt payment .
However, it would depend on our production line schedule(the timing clients place order)and the complication of the item.
1.To guarantee high quality and efficient management, we have passed ISO9001 quality management system certificate and the CE certification.        Â
2.Whole manufacturing processes are under a very serious and strict system.
3.All of our products are 100% inspected before shipment.Â
Â
However, the terms of CIF and C&F are acceptable which depend of clients.
Â
Useful electrical lifting equipment for garage
Product details:
4.We provide 12 months trouble-free warranty and online support.
Â
Company Information:
FAQ:
May 25, 2020